Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

No Information to Display

10330 TX-110

Renovation, Site Work

No Information to Display

$932,500.00

Public - City

img_map_placeholder

10330 TX-110, Tyler, TX

Subscribe to View Full Documents

All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout. A performance bond, a payment bond, and a maintenance bond, each in the amount of 100 percent of the contract price, with a corporate surety approved by the Owner, will be required for the faithful performance of the contract. Attorneys-in-fact who sign bid bonds or payment bonds, performance bonds, and maintenance bonds must file with each bond a certified and effective dated copy of their power of attorney. The work to be done hereunder includes the furnishing of all labor, materials, transportation, tools, supplies, equipment, appurtenances and incidentals necessary for the complete and satisfactory construction as follows. Work in this section includes all labor, plant, and material necessary to furnish and install all concrete formwork required by the project. Concrete formwork shall conform to all requirements of ACI 301 "Specifications for Structural Concrete for Buildings" and ACI 318 "Building Code Requirements for Reinforced Concrete" and ACI 347 "Recommended Practice for Concrete Formwork" except as modified herein. Work consists of furnishing all plant, labor, materials, equipment, and appliances, and performing all operations in connection with installation of the concrete work, complete, in strict accordance with the Specifications and Drawings.

38 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.