Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

November 16, 2023

September 30, 2024

Multiple Locations

Site Work

No Information to Display

$1,994,104.00

Public - City

img_map_placeholder

Multiple Locations, Beech Grove, IN

Subscribe to View Full Documents

The work shall include approximately 600 feet of bank stabilization, retention pond dredging, and reconstruction of a 24-foot-long dual box culvert and all associated excavation, backfill, earthwork, testing, temporary and permanent erosion control measures, site restoration, and all other incidental work required for a complete installation The work to be performed and the bid to be submitted shall include sufficient and proper sums for all general construction, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution. The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. Wage rates on the project shall not be less than the federal wage scale published by the U.S. Department of Labor. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.