Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

October 9, 2023

April 25, 2024

243 Lakeshore Rd

Renovation

No Information to Display

$1,198,714.00

Public - City

img_map_placeholder

243 Lakeshore Rd, Boulder City, NV

Subscribe to View Full Documents

Work shall include electrical installation of Owner-supplied medium voltage equipment, new conductors, cables, raceway, instrumentation, electrical equipment, support systems, equipment pads and anchorage, modification of existing concrete walls and electrical system analysis. Refurbishment of the Evaporative Cooler control system and all other Work as detailed in the Bid Documents. Question Cutoff Date: 8/5/2023 01:00 PM (ET) Submit questions about the meaning or intent of the Bidding Documents and Contract Documents to Owner via the ''Questions'' tab in the NGEM System. The NGEM System will cut off accepting questions 5 Days prior to the Bid opening date. Questions submitted less than 5 Days prior to the Bid opening date may not be answered. Bidders are hereby notified that the prevailing wage rates established by the Nevada State Labor Commission must be paid to all workmen engaged in the performance of any public works construction contracts awarded for the amount of $100,000 or more. The Owner reserves the right to reject any or all Bids, including, without limitation, the right to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids, and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of Owner to make an award to that Bidder. The Owner also reserves the right to waive informalities. Bids will be evaluated as prescribed by the Contract Documents and Nevada State law. Final Completion April 25, 2024

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.