Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

December 8, 2023

December 31, 2024

108 Northcreek Dr

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

108 Northcreek Dr, Shelbyville, TN

Our team is requesting plans for this project.

Subscribe to View Full Documents

The work to be performed by the CM is specified in the preconstruction phase contract and construction phase contract documents. In submitting a Statement of Qualifications (SOQ), the Respondent represents that it is qualified and capable to provide all the requirements of both contracts. The following is a brief overview of the services the CM will be required to perform, if awarded both the preconstruction phase contract and the construction phase contract: Review the initial cost estimate and provide continuous cost management to assure the design is within the budgeted cost estimate. Participate in the review of the design and provide constructability reviews and analysis. Offer suggestions to improve the quality of the Project. Provide construction planning, phasing, and scheduling during design review and through construction completion. Develop and maintain a Project schedule that incorporates all tasks and approvals of all involved parties necessary to complete the Project within the contract durations. Incorporate integrated project management practices into the Project. Provide quality assurance. Bring design-assist and design-build trade subcontractors into the design phase appropriate for the Project and as approved by Bedford County. Provide cost estimating and value engineering. Reconcile CM cost estimates with Architect’s cost estimates. If Bedford County does not award the preconstruction phase contract or the construction phase contact, the Proposers or CM will not be entitled to recover any monetary awards of any type whatsoever. Bedford County reserves the right to reject all responses to the RFQ. Bedford County may terminate the CM’s preconstruction phase contract prior to the construction phase and seek competitive bids for the construction phase. There is no guarantee the construction phase contract will be awarded. Substantial Completion: December, 2024 The method of Contractor Selection has not been Determined at this time. Question Deadline 07/31/2023

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects