Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 14, 2023

September 13, 2023

January 11, 2024

Multiple Locations

Demolition, New Construction, Renovation, Site Work

No Information to Display

$118,600.00

Public - County

img_map_placeholder

Multiple Locations, Throop, PA

Subscribe to View Full Documents

Project location 1 is the Authoritys Clinton Wastewater Treatment Plant accessed from the entrance road located at 19 Commerce Boulevard, Forest City PA 18421. Project location 2 is the Authoritys Throop Wastewater Treatment Plant at 145 Boulevard Avenue, Throop PA 18512. Work shall consist of 1. Replacement of the existing Clinton WWTP control building ballasted membrane roof (approx. 1,600 S.F., to be replaced with non-ballasted roof) including insulation, flashings and related accessories. A 20% contingency line item has been included in the bid to replace roof decking as needed 2. Replacement of the existing Throop WWTP Garage nonballasted membrane roof (approx. 1,600 S.F.) including insulation, flashings and related accessories. A 20% contingency line item has been included in the bid to replace roof decking as needed Work shall include partial demolition and replacement of the existing control building membrane roof including, decking, insulation and associated flashing. Roofing shall be removed down to the existing steel decking. Decking shall be removed and replaced as indicated on the Plans or as directed by the Owner. Install new adhered membrane roof including EPDM membrane, insulation, and flashings. The contractor shall provide and install all required materials and incidental items, whether specifically indicated or not, as needed to provide a complete and watertight installation meeting the requirements of the manufacturer. The contractor shall remove the existing roofing system, including membrane, insulation, flashings, ballast and all other components as needed down to bare decking. Remove steel decking where indicated on the plans or where directed. The contractor shall remove and legally dispose of all demolition waste. The contractor shall provide temporary cover as needed to prevent water leakage into the building interior during and after demolition until the new roofing system is installed and made watertight. The contractor shall be responsible for any damages to the Owner's facilities due to water leakage or otherwise resulting from the contractor's activities. Question Deadline 08/07/2023 at 4:00 PM ET.

46 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.