Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 8, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Omaha, NE

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Description approximate quantity 1 remove existing pcc paving and replace with 9" pcc paving 1,130 sy 2 remove and replace curb and gutter 15 lf 3 saw-cut pavement 40 lf 4 subgrade preparation 1,130 Sy 5 remove and replace unstable subgrade 15 tn 6 subgrade stabilization 15 cy 7 rout, clean and seal Random cracks 240 lf 8 sodding 80 sy 9 jet exisiting sanitary sewer 1,100 lf the amount of the engineer's Estimate of the construction costs of said improvements. Each bid shall be accompanied, in a separate sealed envelope, by a certified or bank check drawn on a bank whose deposits are insured by the F.D.I.C. or an acceptable bid bond in the amount of $5,600.00 and shall be payable without condition to SANITARY & IMPROVEMENT DISTRICT NO. 278 OF SARPY COUNTY, NEBRASKA as a guarantee that the bidder, if successful, will execute the contract and provide an acceptable Contract Bond from an approved surety in the amount of 100 percent of the contract price. Upon approval, the Owner will issue payment to the Contractor in the amount of 90% of the contracted value of the completed work as of the end of the preceding month, as recommended by the Engineer. Payment for the balance retained will be issued by the Owner upon completion of the work and approval thereof by the Owner's Engineer, City or Governmental approval when necessary, and acceptance by the Owner. Complete digital project bidding documents are available online for viewing or purchase. materials, and equipment required for the project designated as Tiburon Ridge Paving Maintenance 2023, and all other work necessary or incidental thereto, as per plans and specifications on file at the office of said Engineer, at which time Bids will be publicly opened, read aloud, and tabulated. The Owner reserves the right to reject any or all bids and to waive informalities.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects