Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

August 31, 2023

No Information to Display

101 E Main St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

101 E Main St, Jackson, TN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

a. The project involves the replacement of two existing 120.7 Ton York chillers with new units that are compatible with the existing Trane automation system. b. The new chillers should be air cooled and operate on a 230-volt, three-phase power supply. The City reserves the right to reject any and all bids, to waive any informality in bids, and unless otherwise specified by the bidder, to accept any item in the bid Any questions should be addressed, in writing, to Montrell Lawrence, email mlawrence@jacksontn.gov . 1. General Requirements: a. The project involves the replacement of two existing 120.7 Ton York chillers with new units that are compatible with the existing Trane automation system. b. The new chillers should be air cooled and operate on a 230-volt, three-phase power supply. c. The project site is City of Jackson, City Hall. Located at 101 E Main Street, Jackson, TN 38301. d. The bidder should be an experienced and reputable HVAC contractor with a proven track record in chiller installations. e. The bidder should provide all necessary certifications and licenses required for the installation. 2. Equipment Specifications: a. Chiller Model: The new chillers should be a replacement for York YCAJ55HE8-28PA model or an equivalent model that meets or exceeds the following specifications: - Cooling capacity: 120.7 tons - Air-cooled design - Voltage: 230V, three-phase b. Compatibility: The new chillers must be fully compatible with the existing Trane automation system in terms of communication protocols and integration capabilities. c. Efficiency: The new chillers should meet or exceed industry standards for energy efficiency and have a high coefficient of performance (COP). d. Noise Levels: The chillers should be designed to minimize noise levels during operation, ensuring compliance with local noise regulations. 3. Installation: a. The bidder should provide a detailed plan for the installation of the new chillers, including all necessary electrical, plumbing and mechanical work. b. Installation should include a thorough testing and verification of the chillers' performance, including control integration with the Trane automation system. c. The bidder should provide a warranty for the installation work, ensuring that any defects or issues arising from the installation will be rectified promptly. d. Work will need to be completed without disruption of building cooling during operating hours.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.