Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

No Information to Display

6100 SW 9th Ave

Renovation

No Information to Display

$350,000.00

Public - City

img_map_placeholder

6100 SW 9th Ave, Amarillo, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Amarillo is soliciting bids for the replacement of the roof at the Northwest Branch Library Question Deadline 07/31/2023 The City reserves the right to accept or reject any or all responses or parts of responses, to waive any formalities and technicalities, and to accept the bid that can provide the goods or services at the Best Value to the City Contractor will water test all internal drains and notify the Facilities Manager of test results prior to starting work, else the contractor will be held responsible for any plugged drains. 2. This is a complete tear off project. Tear off all roofing materials to the deck and haul away. 3. Contractor shall be responsible for repairs to the deck as necessary. (A per square foot price will need to be noted on bid sheet). 4. Provide and install new insulated system with asphalt. Consisting of 2-layer 2.6 ISO, R- 30 per Amarillo City code. 5. Provide and install 1/8 taper system for drainage. 6. Install /z Gypsum Fiber Roof Board 7. Install 4 layers of Ply 6 roofing felts with asphalt 8. Provide and install new PVC roof drains to replace drains in walls in the Meeting Room and Amarillo Install new 3/8 clean PEA GAVEL in 60# of hot asphalt. 9. Same PLY system to be installed on wall (excluding gravel), with granulated cap sheet over top of parapet.wall with term bar 10. Install walk pads per manufacture recommendation to all equipment.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.