Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 11, 2023

No Information to Display

13001 N La Montana Dr

Addition, Demolition, New Construction, Renovation, Site Work

No Information to Display

$270,000.00

Public - City

img_map_placeholder

13001 N La Montana Dr, Fountain Hills, AZ

Subscribe to View Full Documents

Existing outside space to be converted into an enclosed conditioned storage space which includes new non-rated exterior wall, adding a new door that will be accessed from the exterior and adding openings to existing exterior screen wall. In addition to providing needed storage space, recently completed flatwork is expected to eliminate water ponding and intrusion into the facility due to the original faulty grade. Permitting, Civil work, concrete and exterior screen wall demolition, grading and flatwork is complete. Project to include labor and materials to construct improvements, including: Fire alarm and sprinkler modifications to accommodate newly created space. Close and finish exterior screen wall cuts to match adjacent. Close and finish removed gate posts. Fill and finish to match adjacent. Existing canopy to remain, no work required. See Engineers drawings for fixtures and devices. Install new insulated door, hardware, frame and card reader. New walls, infill to match existing width and finish of adjacent walls. Infill openings to match adjacent construction and refinish entire wall for both interior and exterior sides. Existing ceiling to be repaired and repainted. Acoustical ceiling grid and tile to be replaced as needed. Electrical work/modifications as necessary to accommodate new equipment requirements and lighting specifications. Mechanical work necessary for installation of HVAC specified in drawings. Controls will be integrated with existing BMS system. System shall be tested and balanced. Roof work to accommodate specified penetrations and equipment mounting. Target Town Council Award Date: September 4, 2023 Anticipated Agreement Start Date: September 11, 2023 Questions are due in 21 days. Question Deadline Aug 10, 2023

48 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects