Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 27, 2023

October 11, 2023

December 5, 2023

2000 5th Ave

Renovation

No Information to Display

$163,900.00

Public - City

img_map_placeholder

2000 5th Ave, River Grove, IL

Subscribe to View Full Documents

**As of August 22, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** QUESTIONS, PLEASE CONTACT ARCON ASSOCIATES, INC. - Mr. Gaspare Pitrello (630) 495-1900 Ext. 210 or email gppitrello@arconassoc.com The work is to be performed at: Triton College 2000 Fifth Avenue River Grove, Illinois 60171 The Owner is: Board of Trustees Triton College 2000 Fifth Avenue River Grove, Illinois 60171 2. SCOPE Scope of Work includes, but is not limited to the following: A. The contractor is notified that Allowances are included in this project. See Section 01 21 00 - Allowances. o Furnish and install four (4) headwall columns with power, data, compressed air, and vacuum. Oxygen is NOT included in scope - just compressed air utilizing the existing compressor from the penthouse. o New Closet: New Metal stud partition walls, paint, and VCB. Patch and replace ceiling tiles. Existing lighting to be removed and reinstalled. o Patch flooring and VCB as needed for Mech and Elect. work. o FYI only: All other conditions to remain including exist. walls, ceilings, markerboards, etc. The work is further described in the Bid Documents. 3. GENERAL The Contractor shall supply all labor, transportation, apparatus, scaffolding, and any tools necessary for the completion of the work, maintain and remove temporary equipment, and construct in excellent and workmanlike manner the complete work and everything properly incidental thereto as stated in the contract documents or reasonably implied therefrom. It is not the intent of the contract documents to set forth in detail every item necessary for the construction of this project. Contractor must be qualified for this work and must, without direction, furnish and install everything necessary to provide construction complete and in acceptable order ready for use without additional work. All parts must be coordinated, complete, ready to operate and delivered to the Owner in new condition. Each Contractor shall coordinate his work with any and all other trades and Contractors on the site. His work shall be performed in a timely fashion to meet the project time schedule for all work. BID SECURITY Bids shall be accompanied by a Bid Security as noted in the Advertisement for Bids. Such Bid Security shall be in the form of a certified check or Bid Bond in the amount of 10% of the Proposal. All checks and Bonds shall be made in favor of the Owner. Failure to submit the proper form and amount of Bid Security may result in rejection of the bid. Bid Bonds must be issued by the same company that provides the subsequent Performance and Payment Bonds. The bidder agrees that the proceeds of the Bid Security will become the property of the Owner if for any reason the bidder withdraws his bid prior to the time period noted in the Bid Form. The defaulting bidder shall pay the Owner all costs which exceed the amount of his bid for procuring the performance for the work required by the bidding documents. Such costs include, but are not limited to, additional advertising and architectural and engineering services. Substantial Completion: Wednesday, November 22, 2023 @ 5:00pm

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.