Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

September 29, 2023

No Information to Display

400 W Main St

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

400 W Main St, Canadian, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

For bidding documents, plans and specifications, interested bidders must contact Hemphill County Judge, Lisa Johnson, 806.323.6521, 400 Main St. Suite 200, Canadian, TX 79014. Hemphill County reserves the right to accept or reject any and all bids and proposals. BID SPECIFICATIONS: Reroof area over Clerk's Vault Room in Hemphill County Courthouse *Initial work by Electrician: Disconnect electrical conduits only. Lay aside on the ground. *Initial work by HVAC Contractor: Run computer check on all units/capture the data. Pump down/capture/weigh freon. Disconnect freon lines/remove freon lines. Disconnect communication lines. Set all units on the ground/they must remain level. *Work to be done by Plumbing Company: Remove 2" drain bowl. Install a 4" drain bowl for additional drainage. ***Work done by Roofing Company: Sweep off all gravel and haul away. Tear off old hot tar roof and haul away. Install a #75 base sheet to the Gyp deck. Install a layer of 2" ISO insulation in hot asphalt. Install a 1/2 " wood fibered coverboard onto the ISO insulation. Install a #74 base sheet with hot asphalt. Install a modified cap sheet with hot asphalt. Reroof all parapet walls. Install cant strip. Install a layer of #75 base sheet. Install a finish layer of base flashing. Install new 24-gauge prefinished meal wall cap. Reset all rooftop units in exactly the same spot. Reinstall all electrical. Reattach all roof top unit lines/recharge with new freon Run Computer diagnostic on roof top unit

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.