Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 21, 2023

August 21, 2023

No Information to Display

6037 Price Ave

Renovation

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

6037 Price Ave, McClellan, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

STATEMENT OF WORK Removal of old HVAC and installation of new HVAC unit For building #1102 (MK SHOP) USCG Air Station Sacramento 1.0 GENERAL REQUIREMENTS 1.1 PROJECT DESCRIPTION MK Shop HVAC is not operational, and unit needs to be removed and disposed of for building 1102 MK Shop. New 5 ton, 3 phase, heat pump unit needs to be delivered, installed, and tested for correct function. Contractor will verify specifications. 1.1.1 Technical Point of Contact (POC): MKC Art Castaneda (916-643-7645) LT James Duhamel (916-643-7684) 1.2 LOCATION 1.2.1 Work to be conducted at USCG Air Station Sacramento. 6037 Price Ave McClellan, CA 95652 Building #1106 1.3 AIR STATION AND LOCAL REGULATIONS 1.3.1 The work site is on Government property. All rules and regulations issued by the Commanding Officer covering safety, vehicle operation, and sanitation must be always observed by the Contractor and his employees. 1.3.2 All personnel employed on site shall keep within the limits of the work and shall not enter any restricted area unless required or escort by a unit member. The Contractor's equipment shall be conspicuously marked for identification. 1.3.3 The Contractor shall control its employee's traffic on site. Parking for workers shall be at a suitable location as directed by the Technical POC. 1.3.4 The Contractor shall coordinate work with the technical POC to minimize any disruption to normal unit operations. 1.4 DAMAGE TO GOVERNMENT PROPERTY 1.4.1 Any damage caused to Government or private property shall be corrected at the Contractor's expense. 1.5 SAFETY AND SECURITY 1.5.1 The Contractor shall provide all necessary safety equipment to protect the work site area. All work shall be performed in accordance with O.S.H.A. Safety standards to prevent injury to housing occupants, by-passers, or workforce. 1.5.2 Contractor shall comply with Federal and State of California safety and health regulations. When standards differ, the more stringent shall apply. All accidents and property damage shall be reported to the Technical POC. 1.5.3 The Contractor shall be responsible for the security of their material, tools, and equipment. The Government shall not be responsible for their loss. 1.5.4 The Contractor shall comply with all rules and regulations issued by the National Fire Protection Association covering the use and storage of flammable mixtures or material which might constitute a fire hazard. 2.0 EQUIPMENT 2.1 Contractor shall provide whatever equipment necessary to complete the inspection and service of unit boilers. 3.0 SCOPE OF WORK 3.1 Provide all labor, equipment, and materials, to complete the removal of old HVAC unit, installation, and testing of new 5-ton HVAC unit at building #1102 to include: 1. Lock/Out tag out of power source 2. Disconnect old unit power source and lines 3. Clean any old lines and parts that will stay in place 4. Update electrical components as needed (Thermostat, disconnect switch, etc) 4. Install new 5-ton 3 phase AC and Electrical heat unit 5. Check for leaks (ventilation and refrigerant) 6. Ensure HVAC unit is functioning correctly. (Heating and cooling) 7. Adjust and correct any discrepancies found 8. Remove and dispose of old HVAC unit 3.2 Contractor after inspection shall do a complete test and check for leaks and check for proper operation. 3.3 Services shall be accomplished between the hours of 0800-1530, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative. 3.4 The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement. 3.4.1 Project is to be completed within 07 days of the contract being awarded or as soon as parts arrive. 3.5 The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site. 3.6 The Contractor shall remove all debris, rubbish, and hazardous waste from the job site. 3.7 The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection. 3.8 Unsatisfactory performance shall result in work being re-accomplished at no cost to the government. 3.9 It is the contractor's responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal. 3.10 Point of contact is MKC Art Castaneda (626-497-6000). POC email all quotes to ATTN Gary Agan (916) 643-7678 Gary.C.Agan@uscg.mil Christopher Bahn Christopher.A.bahn@uscg.mil

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.