Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

June 30, 2024

235 Marshall Ave

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

235 Marshall Ave, Saint Paul, MN

Subscribe to View Full Documents

Replacement of existing Cooling Towers, located at the East Tower Building. Hydronic piping from Chiller to the new Cooling Towers will be replaced to accommodate the new Cooling Tower. The existing and new piping will traverse (4) four stories from the lower-level mechanical room to the penthouse level. Architectural, structural, and electrical modifications required to support the mechanical work are also included. Interior walls and ceilings will be patched, repaired finished to match existing construction and as required for fireproofing of penetrations through the mechanical shaft.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.