Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 7, 2023

September 6, 2023

December 27, 2023

120 S 6th St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

120 S 6th St, Louisville, KY

Subscribe to View Full Documents

A. The Construction Project Schedule shall be prepared using the Critical Path Method (CPM) of network calculations. The Schedule Manager shall provide the schedule in either the Precedence Diagram Method (PDM) or the Arrow Diagram Method (ADM). A bar chart Construction Project Schedule listing all work activities and durations may be provided if approved in advance by the Owner. B. The Construction Project Schedule shall include a detail program for construction, purchasing of critical materials, and for submission of shop drawings and samples. All construction activities must show work phasing requirements. The schedule must be signed by an official of the firm. It must be realistic as its faithful execution will be considered a commitment, not an estimate. 15% for certified minority owned businesses 5% for certified female owned businesses; and 0.5% for certified handicapped owned businesses. The 6th and Main Garage 2023-2024 Repairs consist of the following work: 1. Concrete slab, column, beam, and miscellaneous repairs. 2. Epoxy injection repairs. 3. Vehicular traffic membrane installation. 4. Penetrating concrete water repellent installation. 5. Sealant repairs. 6. Facade cleaning. 7. Supplemental drains and piping installation. Questions Due Date: Jul 31st 2023, 3:00 PM EDT (Via online portal). Pre-bid meeting info : Tap to join from a mobile device (attendees only) +1-415-655-0001,,23068387516## US Toll Join by phone +1-415-655-0001 US Toll Global call-in numbers

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.