Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
July 28, 2023
January 8, 2024
No Information to Display
Manning Dr
Site Work
No Information to Display
No Information to Display
Public - State/Provincial
Manning Dr, Edmonton, AB
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
On behalf of Northwest Connect General Partnership (“NWC”) the following request for tender (“RFT”) has been prepared and distributed in search of professional contracting services. In 2008 NWC entered into a Design-Build-Finance-Operate-Maintain Agreement (“DBFOM”) with Alberta Ministry of Transportation and Economic Corridors (“Alberta TEC”) for the Northwest Anthony Henday Drive (“NWAH” or “the Project”); and is responsible for all aspects of the highway’s construction, operations, and rehabilitation as per the project technical requirements. The Project is approximately 21km of four and six-lane highway, with eight interchanges and 29 structures in Edmonton, Alberta. Vercity Canada is NWC’s management service provider for the operations, maintenance, and rehabilitation (OMR) phase of the Project. The project operator is Carmacks Maintenance Services Limited (“CMSL” or the “Operator”). CMSL is responsible for all Operations and Maintenance (O&M) activities on the road and will coordinate the safety on the project and for the traveling public. Tetratech represented by Greg Richley is retained by NWC as the project consultant and will provide selective construction supervision services. NWC is requesting quotations from competent contractors to rehabilitate roadside drainage ditch and to repair erosion areas around gabion baskets near Manning Drive interchange. Further details of this work are provided below. Over the past few years, we have encountered erosion around five gabion baskets, which were installed in 2011, primarily to slowdown water flow velocities and to avoid washing away ditch soils while vegetation growth developed over time within a length of approximately 325 meters. However, during periods of high flows, the water has been flowing around the unarmored side of the ditch resulting in erosion. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. No bids received.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Edmonton, AB
Bid Date: Aug 25 2023
Edmonton, AB
Bid Date: Sep 06 2023
Edmonton, AB
Bid Date: Aug 17 2023
Edmonton, AB
Bid Date: Aug 01 2023
Edmonton, AB
Bid Date: Aug 01 2023
Edmonton, AB
Bid Date: Aug 01 2023
Edmonton, AB
--
Edmonton, AB
Bid Date: Aug 17 2023
Edmonton, AB
Bid Date: Aug 11 2023
Edmonton, AB
--
Edmonton, AB
Bid Date: Aug 02 2023
Edmonton, AB
--
Edmonton, AB
Bid Date: Sep 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
