Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

September 8, 2023

January 19, 2024

US-50

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

US-50, Pueblo, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000325518 This Request for Proposal (RFP) is intended to be used to select a Design Build Team (DB Team) for the design and construction of the Proposed 16" Potable Water Transmission Main Crossing at E. Highway 50 near E. 12th Street in Pueblo, Colorado. Question Acceptance Deadline 07/27/2023 at 4:30 PM MT Questions are submitted online Yes General Requirements - Bidder Prequalification/Preregistration Required - FOB Destination - Insurance Required - License Required Award Requirements - All or None Award Background: This Request for Proposal (RFP) is intended to be used to select a Design Build Team (DB Team) for the design and construction of the Proposed 16" Potable Water Transmission Main Crossing at E. Highway 50 near E. 12th Street in Pueblo, Colorado. B. Overview: An Arkansas Valley Conduit (AVC) Delivery Pressure Evaluation report from June 2020 identified 4 pipe segments in the Pueblo Colorado vicinity that would incrementally increase pipeline delivery capacity near 36th Lane and E. US HWY 50 (Connection Point to AVC). This 16" Transmission Main addition is required as a component of the required improvements to meet the 3.2 MGD demand capacity at the Connection Point. C. Goals: Design and Construction 16" a potable water main crossing of E. US Hwy. 50 from the intersection of York St./E. 12th St. to a connection with a 20" main, along the north side of and within the R.O.W. of E. Hwy. 50. SECTION II. - Statement of Work A. Description of the Project: The DB Team will successfully and safely complete the engineering and construction of the 16" transmission main that will cross under an adjacent arroyo and E. US Highway 50. This should be accomplished according to a managed schedule; in accordance with the project's permitting requirements; and with the highest quality design and construction - all while providing the best possible value to Pueblo Water. The chosen DB Team will be responsible for all activities necessary within their project approach to evaluate existing dimensions and conditions of the existing facilities, formulate a design, and construct the approved designed features. At a minimum, the project approach shall address the following: o Evaluation of installation methodology, i.e., open-cut, directional drill, and/or horizontal bore that will ensure best cost, protection, and longevity of the pipeline. o Assist Pueblo Water with securing necessary easements outside Rights of Way. o Design of pipe crossing and appropriate "tie" in points, North and South of crossing. Include Technical Specifications, Erosion Control Plans, etc, needed for a full working set of construction plans and documents. o Design of any necessary pipe protection features. The listed specifications, terms, and conditions to be discrepant, incomplete, or otherwise questionable in any respect, it shall be the responsibility of the concerned party to notify the Procurement Specialist of such matters imme

59 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.