Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 5, 2023
September 8, 2023
January 19, 2024
US-50
Site Work
No Information to Display
No Information to Display
Public - City
US-50, Pueblo, CO
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Reference Number 0000325518 This Request for Proposal (RFP) is intended to be used to select a Design Build Team (DB Team) for the design and construction of the Proposed 16" Potable Water Transmission Main Crossing at E. Highway 50 near E. 12th Street in Pueblo, Colorado. Question Acceptance Deadline 07/27/2023 at 4:30 PM MT Questions are submitted online Yes General Requirements - Bidder Prequalification/Preregistration Required - FOB Destination - Insurance Required - License Required Award Requirements - All or None Award Background: This Request for Proposal (RFP) is intended to be used to select a Design Build Team (DB Team) for the design and construction of the Proposed 16" Potable Water Transmission Main Crossing at E. Highway 50 near E. 12th Street in Pueblo, Colorado. B. Overview: An Arkansas Valley Conduit (AVC) Delivery Pressure Evaluation report from June 2020 identified 4 pipe segments in the Pueblo Colorado vicinity that would incrementally increase pipeline delivery capacity near 36th Lane and E. US HWY 50 (Connection Point to AVC). This 16" Transmission Main addition is required as a component of the required improvements to meet the 3.2 MGD demand capacity at the Connection Point. C. Goals: Design and Construction 16" a potable water main crossing of E. US Hwy. 50 from the intersection of York St./E. 12th St. to a connection with a 20" main, along the north side of and within the R.O.W. of E. Hwy. 50. SECTION II. - Statement of Work A. Description of the Project: The DB Team will successfully and safely complete the engineering and construction of the 16" transmission main that will cross under an adjacent arroyo and E. US Highway 50. This should be accomplished according to a managed schedule; in accordance with the project's permitting requirements; and with the highest quality design and construction - all while providing the best possible value to Pueblo Water. The chosen DB Team will be responsible for all activities necessary within their project approach to evaluate existing dimensions and conditions of the existing facilities, formulate a design, and construct the approved designed features. At a minimum, the project approach shall address the following: o Evaluation of installation methodology, i.e., open-cut, directional drill, and/or horizontal bore that will ensure best cost, protection, and longevity of the pipeline. o Assist Pueblo Water with securing necessary easements outside Rights of Way. o Design of pipe crossing and appropriate "tie" in points, North and South of crossing. Include Technical Specifications, Erosion Control Plans, etc, needed for a full working set of construction plans and documents. o Design of any necessary pipe protection features. The listed specifications, terms, and conditions to be discrepant, incomplete, or otherwise questionable in any respect, it shall be the responsibility of the concerned party to notify the Procurement Specialist of such matters imme
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Pueblo, CO
Bid Date: Aug 09 2023
Pueblo, CO
Bid Date: Aug 25 2023
Pueblo, CO
Bid Date: Aug 09 2023
Pueblo, CO
Bid Date: Aug 02 2023
Pueblo, CO
Bid Date: Aug 02 2023
Pueblo, CO
Bid Date: Aug 02 2023
Pueblo, CO
Bid Date: Aug 02 2023
Pueblo, CO
Bid Date: Aug 02 2023
Greeley, CO
Bid Date: Aug 30 2023
Loveland, CO
Bid Date: Aug 31 2023
Aurora, CO
Bid Date: Aug 17 2023
The Pinery, CO
Bid Date: Jul 10 2023
Golden, CO
--
Ignacio, CO
Bid Date: Aug 22 2023
Durango, CO
Bid Date: Aug 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
