Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 13, 2023

December 14, 2026

To Be Determined

Site Work

No Information to Display

$44,836,987.00

Public - City

img_map_placeholder

To Be Determined, San Diego, CA

Subscribe to View Full Documents

FTA Grant Number: Federal 5307 CA-90-Z207, Federal 5307 CA-2021-195 Reference Number 0000325302 *The Del Mar Bluffs Stabilization 5 (DMB5) is a maintenance of way project, to maintain the existing track and protect it from erosion, seismic events, and wave action. The project site is located along a 1.6-mile portion of the existing NCTD railroad ROW in the City of Del Mar that extends from rail Milepost (MP) 244.1 near Coast Boulevard south to MP 245.7 at Torrey Pines State Beach. Generally, construction will consist of installation of new track bed stabilization improvements, including installation of up to 180 new CIDH soldier piles, a 5ft deep continuous concrete grade beam between the piles, and tieback anchors. Retrofit of existing solider piles with 5ft deep continuous concrete grade beams, and addition of tiebacks if necessary. Installation of approximately 2098 LF of new seawalls at the toe of the bluff consisting of CIDH piles with exposed steel members above the surface and wood lagging in between. Additionally, select areas behind the seawalls will be filled at a 2:1 slope to catch mid-bluff, with some areas requiring a full regrading of the slope at 1.5:1 with surface stabilization. Revegetation of fill slopes and regraded slopes will be required. The project also includes installation of drainage improvements including new storm drain pipelines and outlets to the beach, concrete-lined trackside ditches, underdrains, new and modified inlets to existing storm drain systems, concrete channels, splash walls, new channel aprons, and new and modified drainage structures. Installation of supporting structures for select drainage improvements will be required including installation of a soil nail wall adjacent to a new concrete-line trackside ditch, and a solider pile wall to support portions of a concrete channel that runs along the eastern upper bluff. Installation of access road improvements including re-grading of the existing access road and addition of stabilizing material to surface the road. For the SWPPP, this project is a Risk Level 2* Question Acceptance Deadline 9/29/23 5:00 PM PST/PDT Questions are submitted online Yes Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Contractors License Required - Insurance Required - Prevailing Wage Required Deadline for Questions - Date: September 29, 2023

121 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.