Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 18, 2023

October 18, 2025

1501 S K15 HWY

Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

1501 S K15 HWY, Derby, KS

Subscribe to View Full Documents

Proposals must be accompanied by a certified or cashier's check, or bid bond is acceptable to the City in an amount not less than five percent (5%) of the proposal. Checks are to be made payable to the City of Derby and drawn on a solvent Kansas Bank or Trust Company. These checks or bonds are to be retained by the City Clerk until the contract for the project shall have been awarded. The project is briefly described as follows. The Bidding Documents consisting of the drawings and project manual may be examined and obtained from Drexel Technologies at Additionally, Bidding Documents may be picked up at Drexel Technologies on a CD or downloaded electronically. See the Drexel Technologies website for pricing. Drexel Technologies will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through Drexel Technologies. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than Drexel Technologies. Bidders on this work will be required to comply with the President's Executive Order No. 11246. Requirements for bidders and contractors under this order are explained in the specifications. Derby Wastewater Treatment Plant Improvements - Phase 1: Installation of new manhole and influent flow meters; influent pump station upgrades; headworks screening and grit equipment replacement; electrical equipment replacement; odor control piping and in-ground biofilter; electrical building; site improvements. Questions should be directed to Sarah Unruh, P.E., Sarah.Unruh@pec1.com, 316- 206-1410.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.