Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

August 30, 2023

September 29, 2023

1535 11th St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

1535 11th St, Rock Island, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Scope of Work The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan Install Tyvek house wrap over all the existing wood siding over lapping 6, tape all the seams. Install fan fold over the house wrap taping all the seams installed with cap nails. Bend white break metal around the bottom of wall installing over the wrap and fold and returning to the foundation. Install double 4 vinyl siding choice of colors the homeowner selects from samples provide by the contractor. All wall and floor penetrations shall have either a light block or split trim installed and caulked with a color match. All top course pieces must be snap-locked into a utility trim preventing siding from blowing off. Install missing soffit and fascia mostly on the room addition. Install new white gutters and downs through out the entire house. Install 6 tail pipes off the downs with hinged flip-ups securing the tails from being blown off. Minimum 2 straps per 8 of down securing to the wall. All Connections must have at least 2 white screws per joint. The contractor shall have 30 days to complete the work from the date of contract signing.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects