Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 26, 2023

August 25, 2023

October 24, 2023

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Glendale, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work in the Bid is defined in the Project Specifications and will generally include, but not limited to. Completion: This Work must be completed within 60 calendar days from the Date of Commencement as established by the Citys written Notice to Proceed. Each Bid must be made on the Bid Forms obtainable at the Public Works Facilities Management Division. Each Bid shall be accompanied by a cashiers check or certified check drawn on a solvent bank, payable to City of Glendale, for an amount equal to ten percent (10%) of the total maximum amount of the Bid. Alternatively, a satisfactory corporate surety Bid Bond for an amount equal to ten percent (10%) of the total maximum amount of the Bid may accompany the Bid. Said security shall serve as a guarantee that the successful Bidder, within fourteen (14) calendar days after the Citys Notice of Award of the Contract, will enter into a valid contract with the City for said Work in accordance with the Contract Documents Glendale Police Department Remove and dispose of 50,000 sq. ft. of existing flooring material. Install 50,000 sq. ft. of new Mowhawk Group New Basics III BT 400 / 978 Mineralite carpet tile provided by the city. Provide and install rubberized cove base on all areas where carpet meets the wall. Provide and install rubberized transitions where flooring materials differ in thickness. Glendale Fire Station 21 Remove and dispose of 35,000 sq. ft of existing flooring material. Install 10,000 sq. ft. of new Philadelphia Capital III Tile / 80572 Governor carpet tile provided by the city. Install 25,000 sq. ft. of new Philadelphia In The Grain II / 00568 Flaxseed High Performance LVT tile provided by the city. Provide and install rubberized cove base on all areas where flooring materials meets the wall. Provide and install rubberized transitions where flooring materials differ in thickness.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.