Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

October 25, 2023

June 28, 2024

Multiple Locations

Site Work

No Information to Display

$4,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Pueblo, CO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000325299 This project will improve existing channelization of the Arkansas River through this reach by replacing the concrete spillway structure along the northern subchannel on river left with a series of 5 drop structures each separated by a recovery pool. The overflow weir along the main channel on river right will be replaced with a single spillway chute structure. The two channels combine to form a single channel below the spillway and the fifth drop structure of the boater channel, which conveys the total river discharge through a sixth (final) drop structure and recovery pool where it then arrives at the existing river channel. Channel and bank stabilization will be provided via concrete structures, grouted riprap, and loose-placed riprap of varying dimensions. Additional amenities within the of services will include the construction of access trails, assembly and placement of a new pedestrian bridge, and the relocation of an existing wooden pedestrian bridge. Question Acceptance Deadline 08/09/2023 at 2:00 PM MT Questions are submitted online Yes General Requirements - Contractors License Required - FOB Destination - Insurance Required - License Required Each bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid amount. Any bid submitted after the time and date specified will not be considered. Period For Completion: Pueblo Water Will Award the Contract By August 18, 2023. The Completion Of The Total Contract Is Required By June 28th, 2024. Pueblo Water reserves the right to reject any and all bids, or to accept that bid or proposal which in their opinion best serves the interest of Pueblo Water. Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Surety Bond 100 % - Payment Bond 100 %

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects