Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 12, 2023

August 15, 2024

43 Lake Ave Ext

Renovation

No Information to Display

$1,850,000.00

Public - State/Provincial

img_map_placeholder

43 Lake Ave Ext, Danbury, CT

Subscribe to View Full Documents

WCSU O'Neill Center HVAC Equipment Replacement Project Westside Campus Please provide the following as part of the Bid - 10% Bid Bond. A 10% Material and Labor Bond and 10% Performance Bond are not required as part of the bid but will be required as part of the award of Contract. Performance Bond: For all general bids in excess of $50,000.00, the Apparent Lowest Qualified Bidder, upon being notified by the Agency of its apparent lowest qualified Bidder status, shall within ten (10) days after notification thereof, substitute for the Bid Security accompanying his bid, a properly executed Performance Bond, in the form provided herein, in the amount of one hundred (100%) percent of the Contract Price. Labor and Material Bond: For all general bids in excess of $50,000.00, the Apparent Lowest Qualified Bidder, upon being notified by the Agency of its apparent lowest qualified Bidder status, shall within ten (10) days after notification thereof, submit to the Agency an additional Bond, in the sum of not less than one hundred (100%) percent of the Contract Price. Bidders are required to provide a copy of the company's current certification. Also, DAS certified bidders must indicate their Set-Aside status by writing SBE/MBE on the lower left-hand corner of the envelope in which the bid is submitted. The CT Department of Labor's Prevailing Wage Rates requirement shall apply to this project. Question Deadline: 08/07/2023 at 4:00 PM ET Work shall commence within two (2) weeks of issuance of contract or letter of intent; all work must be completed no later than August 15, 2024. The University reserves the right to waive any technical defects in the bids, to reject any bids that do not conform to the terms described herein, and to accept or reject any part of any bid, and to reject all bids and, again, invite bids

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.