Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 7, 2023

February 4, 2024

2590 Point Township Dr

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

2590 Point Township Dr, Northumberland, PA

Subscribe to View Full Documents

The estimated budget is $550,000. A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following 1. The replacement of existing pipe culvert at North Shore Railroad Milepost 207.66. Work consists of removal of existing pipe culvert, installation of new 102 reinforced concrete pipe culvert, construction of new Standard Ballasted Track with existing rail and OTM, approach track resurfacing, required site work, and other Work indicated in the Contract Documents. 2. Contractor shall provide all labor, services, materials, equipment, and incidental costs necessary for the performance, testing, start up, and completion of the Work. 3. Unless otherwise specified, all work shall be performed in accordance with generally accepted standards of construction methods and within the guidelines established by these specifications. B. Project will be constructed under a single construction contract. Contract 2023-03 includes but is not limited to replacement of the existing temporary plastic pipe with a new 106 diameter reinforced concrete pipe, rock lining at both inlet and outlet structures, installation of new ballast with existing track, raising, lining and surfacing approach tracks, and required site work. The SEDA-COG Joint Rail Authority reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the SEDA-COG Joint Rail Authority, and to reject any or all bids.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.