Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

September 29, 2023

No Information to Display

5199 Riverside Dr

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

5199 Riverside Dr, Irving, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

A. The work includes unbolting and removal of three existing corroded stem guides, drilling new holes, and mounting three new 316 stainless steel stem guides with new stainless-steel anchors and hardware. B. The Contractor shall inspect the condition of the ACME threaded slide gate stem, and stem connection to the gate. C. The slide gate stem guides are located inside a wastewater lift station wet well. The facility will have active wastewater flowing through the wet well throughout the course of the work. The Contractor shall be responsible for providing any forced air, self-contained breathing apparatus, air monitoring, and confined space entry equipment as necessary to safely perform the work inside the wet well. D. The Contractor shall attend one site visit with City of Irving personnel prior to beginning work. E. The Contractor shall notify City of Irving upon discovery of additional repair work not covered in the scope, for City of Irving approval. F. The Contractor is responsible for properly disposing of the existing corroded stem guides and any other equipment or parts that need to be removed to complete the work Question Deadline 07/20/2023 at 8:00 AM CT The responses will be posted after consultation with the appropriate department personnel. If the responses necessitate a significant change to the specifications, an addendum will be issued. The work includes unbolting and removal of three existing corroded stem guides, drilling new holes, and mounting three new 316 stainless steel stem guides with new stainless-steel anchors and hardware. The slide gate stem guides are located inside a wastewater lift station wet well. The facility will have active wastewater flowing through the wet well throughout the course of the work. The Contractor shall be responsible for providing any forced air, self-contained breathing apparatus, air monitoring, and confined space entry equipment as necessary to safely perform the work inside the wet well. The City of Irving reserves the right to terminate the contract without prior notice in the event the Respondent defaults or breaches any of the terms and conditions of this contract, or otherwise fails to perform in accordance with the bid specifications

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.