Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

January 12, 2024

No Information to Display

2230 Main St

Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

2230 Main St, Winnipeg, MB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Project will include upgrades to the biosolids facilities of the NEWPCC, including systems to convert sludge produced on site and hauled from the City of Winnipeg's (the City) South End Sewage Treatment Plant (SEWPCC), the West End Sewage Treatment Plant (WEWPCC) for beneficial re-use. As such, upgrades to accept, store, treat and stabilize the sludge produced from the treatment of wastewater is required. The Project scope includes: - installation of a hauled raw sludge receiving facility to receive sludge from the WEWPCC, and the SEWPCC - installation of a fermentation and phosphorous release facility to store sludge and to promote the release of phosphorous; - installation of a pre-digestion sludge treatment facility to screen, blend and equalize sludge, dewater the sludge, and thermal conditioning of the dewatered sludge through the Cambi Thermal Hydrolysis (CHT) system; - installation of an anaerobic digestion facility to digest and store the sludge; - installation of a biosolids processing and loading facility, including Ostara phosphorous recovery, chemical and phosphorous storage areas, dewatering centrifuges, truck loading area, area control and automation, field control station and employee amenities; - installation of a digester gas handling facility to receive gases collected from the anaerobic digestion facility for treatment to remove moisture and hydrogen sulfide, a major cause of odors; and, - associated works, such as yard work, tunnels, internal piping galleries, external wastewater/stormwater piping and water distribution, roads, landscaping, fire protection, etc. The Work is to be performed while minimizing impact on the operation of the existing NEWPCC facility. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.