Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$149,169.00

Public - County

img_map_placeholder

Multiple Locations, Fort Sam Houston, TX

Subscribe to View Full Documents

The work consists of providing the necessary labor, materials, equipment, and supervision to construct 2023 Off-Site Lift Station Rehabilitation for Harris County Water Control & Improvement District No. 109 including but not limited to mobilization, bonds and insurance, and all else as stated below. Lift Station No. 1 The work includes but is not limited to removing and replacing the pump access hatch; installation of fall protection grating to the pump access hatch covers; site restoration; reinstalling alarm beacon cover on control panel; replacing and painting conduit bodies that are specified by construction drawings; replacing control panel cable tray; recoating back panel, installing CSBE seal, and replacing terminal blocks in pump terminal box; connecting drain wire to the transducer cable shielding in the transducer terminal box; replacing terminal blocks and reapplying duct seal to the conduit opening in the float terminal box; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. Lift Station No. 2 The work includes but is not limited to installation of fall protection grating to the pump access hatch; blasting and recoating pump piping and fittings from suction wall collar to three (3) feet up the riser pipe for both pump piping; power tool cleaning both pumps; removing the pipe support, sealing pipe support leak with Hydrophilic Urethane or Polyurethane, and reinstalling pipe support; replacing corroded conduit floor mounting supports; sealing penetration at the bottom of the control panel; replacing isolation switch relay and alarm horn in control panel; replace corroded terminal box mounting plate; replace loose conduit body on the float terminal box; replace corroded in back plate of pump terminal box; replace corroded conduit hubs and CSBE seals on both pump terminal boxes; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. Lift Station No. 3 The work includes but is not limited to installation of fall protection grating to the pump access hatch; cleaning and recoating exposed rebar and repairing concrete along dry well wall as shown in plans; removing and replacing ball valve including pipe nipple and cold galvanizing threaded connection; blasting and recoating piping from suction wall collar to riser piping for both pumps; power tool cleaning both pumps; cleaning and cold galvanizing stair metal support; replacing Pump No. 2 anchorage; site restoration; rerouting existing pump power cables; sealing conduit hubs on pump and well power box; replacing corroded DIN railing and missing terminal block in the transducer terminal box; installing EYS seal with chico and replacing the conduit hub and seal to the transducer terminal box; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. Lift Station No. 4 The work includes but is not limited to replacing conduit hub inside the autodialer enclosure; installing EYS seals on the pump and Float Terminal boxes for conduits to control panel; Install terminal black and terminate transducer cable inside transducer/float terminal box; Install CSBE seals on conduit to the wet well and install EYS seals on conduit to the control panel for transducer/float terminal box and Pump No. 2 terminal box; replacing conduit hubs on the Pump No. 2 terminal box; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. Lift Station No. 5 The work includes but is not limited to providing a new Main Disconnect Switch and relocating the existing manual transfer switch and generator receptacle; replace corroded mounting hardware on service rack; wire brushing and recoating control panel enclosure; replacing alarm horn in control panel; replacing corroded conduit hub in the Pump No. 1 terminal box; wire brushing and recoating Pump No. 2 terminal box; wire brushing and recoating Float terminal box; installing missing CSBE seal and cleaning out debris in the float terminal box; reinstalling CSBE seal on transducer terminal box; all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. The project is located in Harris County at the following sites: Lift Station No. 1 - 5610 Lodge Creek, Houston, Texas 77066 Lift Station No. 2 - 1/2 Pinewood Springs Drive, Houston, Texas 77066 Lift Station No. 3 - 14017 Cashel Forest, Houston, Texas 77066 Lift Station No. 4 - 5933 FM 1960, Houston, Texas 77066 Lift Station No. 5 - 4220 1/2 Timbermeadow Oak, Houston, Texas 77066 All questions shall be submitted to the Engineer via online.

44 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects