Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Lake Charles, LA

Subscribe to View Full Documents

Creosote Impacted Drainage Ditch Remediation Proposal Guaranty: 5% of Amount of Bid the form of a bid bond, certified check or cashier s check as prescribed Bids must be submitted on the forms provided by the Contracting Agency, must be prepared in accordance with Section 2 of the 2018 Edition of the Louisiana Department of Transportation and Development, Office of Multimodal Commerce, General Provisions and must include all the information required by the bid form. All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. The general scope of work includes the excavation and disposal of contaminated soils and returning the ditch to preconstruction contours. To accomplish these tasks, the excavated material will need to be containerized and characterized for proper disposal. For purposes of this bid, it should be assumed that the waste will be non-hazardous and the quantity is 1,500 cubic yards. A third-party environmental consultant will perform confirmatory sampling at the site to ensure all contaminated soils have been removed. The Owner or his representative will determine when the placement of backfill can occur.The drainage ditch is located east of Port Gang Road and south of Port Gateway Circle. A railroad spur parallels the ditch to the north and the container pad borders the ditch to the south.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.