Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 15, 2023
September 16, 2023
October 31, 2024
To Be Determined
Site Work
No Information to Display
$200,000.00
Public - City
To Be Determined, Montreal, WI
The work for which bids are asked includes the following: A new 57 ft. by 40 ft. Water Treatment Building with cast-in-place concrete foundation, wood-framed walls vinyl siding, metal roof, plumbing, HVAC, painting, and electrical work; mechanical piping, valves and appurtenances, process instrumentation and controls, standby generator and automatic transfer switch. Water Treatment Equipment including two 6'-6" diameter vertical pressure filter vessels, air wash blower, and one (1) liquid chemical feed system. Supervisory Control and Data Acquisition (SCADA) system improvements at nine (9) sites. Improvements at the existing Wellhouse #3 Building, including installation of a variable frequency drive (VFD) and magnetic flow meter. Site work including 720 LF of 8-inch ductile iron water main, valves, hydrants, and appurtenances, one (1) 15,000-gallon buried precast concrete detention tank, 250 LF of 1.25-inch low pressure sewer main, clearing & grubbing, site grading, backfill, aggregate base course and asphalt pavement for driveways and parking areas, erosion control, site restoration and planting. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at electronically. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith fort to achieve a combined minimum goal of 15% participation for MBE/ WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. OWNER reserves the right to waive any informalities or to reject any or all bids. Contractor shall furnish performance and payment bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all of Contractors obligations under the Contract Documents BIDDER agreesthat the Work will be substantially completed on or before October 15, 2024 and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before October 31, 2024.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Pewaukee, WI
--
Potter Lake, WI
Bid Date: Aug 04 2023
Cuba City, WI
Bid Date: Aug 04 2023
Madison, WI
Bid Date: Aug 22 2023
Sheboygan, WI
Bid Date: Aug 04 2023
Manitowoc, WI
Bid Date: Aug 04 2023
La Crosse, WI
Bid Date: Aug 03 2023
Fitchburg, WI
--
Trempealeau, WI
Bid Date: Jun 07 2023
Reedsburg, WI
Bid Date: Aug 08 2023
Washburn, WI
Bid Date: Aug 08 2023
Verona, WI
Bid Date: Aug 08 2023
New London, WI
Bid Date: Aug 08 2023
Lac du Flambeau, WI
Bid Date: Sep 04 2023
West Allis, WI
Bid Date: Aug 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
