Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

August 31, 2023

October 12, 2023

Multiple Locations

Site Work

No Information to Display

$357,240.00

Public - City

img_map_placeholder

Multiple Locations, Burlington, WA

Subscribe to View Full Documents

**As of August 18, 2023, project was awarded to Core Infrastructure Services, but awarded amount is not available.** This project provides for the installation of approximately 610 linear feet of8-inch PVC gravity sewer main by open cut method. In addition, the project provides for the connection of existing side sewers by open cut method, manhole installation, surface restoration, and traffic control. The Work shall be substantially complete within 30 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Burlington, Washington. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Burlington" and in an amount of not less than five percent (5%) of the total Proposal amount. For assistance, please call (206) 284- 0860.Contract questions shall be directed only to the office of the Project Engineer. Financing of the Project has been provided by City of Burlington, Washington. The City of Burlington expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. ESTIMATE $325,000 TO $375,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.