Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 1, 2023

No Information to Display

Multiple Locations

Renovation, Site Work

No Information to Display

$1,288,310.00

Public - Federal

img_map_placeholder

Multiple Locations, Heath, OH

Subscribe to View Full Documents

This project involves the redevelopment of two buildings located at 1401 & 1425 Mt. Vernon Road, Newark. This project will include limited demolition, building structural repairs, skylight replacements, lighting upgrades, HVAC replacement & addition, plumbing repairs & replacement, flooring repair & replacement, drop ceiling replacement, store front glass replacement and painting per the redevelopment plans. 1401 Mt. Vernon Road, Newark. This project consists of renovation of a 8,470 square foot, 1 story pre-engineered metal building structure, and slab on grade. The purpose of the building is for future industrial/office tenant fit-out the building has a 3,158 SF office area. The building is not sprinklered. Interior will be heated with new equipment. 1425 Mt. Vernon Road, Newark. This project consists of renovation of a 16532 square foot, 1 story with mezzanine pre-engineered metal building structure, and slab on grade. The purpose of the building is for future industrial/office tenant fit-out the building has a 5,888 SF office area. The building is not sprinklered. Interior will be heated with existing and new equipment. 2023 stemflex building improvement project2023 stemflex building improvement project2023 stemflex building improvement project. A bid bond for 100% of the bid amount or a certified check on a solvent bank for 10% of the bid amount must accompany bid. If bid is accepted, a contract will be entered into with a required performance bond in the amount of no less than 100% of the contract price. Bond returns conditional upon the faithful performance of the contract.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.