Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 4, 2023

September 27, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Lewiston, NY

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The General Services Administration (GSA) has been tasked in supporting the Customs and Border Protection (CBP) Counter Weapons of Mass Destruction (CWMD) branch for construction services, management and oversight for replacing multiple RPM at multiple Land Ports of Entry (LPOE). The contractor shall provide all supervision, labor, material and equipment necessary to perform the RPM replacements. Unique and technically compatible equipment, such as the RPM replacement, will be provided by CWMD - coordination for reception with the Contractor is key. All supporting infrastructure associated with RPM replacement shall be included to make newly installed RPMs fully operational. Supporting infrastructure can include: Communications Control Box (CCB) with network switch and fiber patch panel, Control Box (CB), Battery Box (BB), Camera Box, Analysis Computer Station (ACS), Reutilize existing power supply, install supporting Visual Identification System Cameras, Field Point Gateway Server in applicable LAN rooms, annunciators in applicable booths, install applicable monitor computers in appropriate buildings, and installation of new fiber as required. The contractor shall reuse applicable and carryover infrastructure as much as possible to reduce overall installation costs to provide best value for the government. Coordination with local port authorities to maintain operations and minimize construction impact to commercial traffic flow. This proposed contract action is being publisized in accordance with FAR 5.2. Intrested parties are asked to submit a capabilities statement to the POC's identified in this publication.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects