Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 4, 2023

September 4, 2023

April 5, 2024

808 S Washington St

Demolition, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

808 S Washington St, Cuba City, WI

Subscribe to View Full Documents

Demolition and removal of a 64,000 sq. ft. building, foundation walls, utilities, and site improvements. Restoration of the site by removing existing asphalt, sidewalks, and curbs, leveling disturbed areas, installing salvaged topsoil, and fertilizing, seeding, and mulching the restored areas. Termination of utility services to the buildings at the exterior property lines. The City of Cuba City reserves the right to waive formalities in bidding and to reject any and all bids. The construction types vary throughout the buildings and there is an. approximately 7,300 sq. ft. basement located under a portion ofthe building. The Contractor shall remove, transport and properly dispose of all materials. Existing asphalt, sidewalks and curbs shall be removed and will be restored by placing 6" ofsalvaged topsoil over the areas. Contractor shall restore the entire site by leveling the areas disturbed, establishing a topsoil borrow area, installing 6" ofsalvaged topsoil material over the areas disturbed and over the borrow area. The top soiled areas shall be fertilized, seeded and mulched. Contractor shall terminate all utility services to the buildings at the exterior property lines and coordinate that work with the Utility Companies and the City ofCuba City. The Owner had an Abatement Report prepared to determine hazardous materials that will need to be disposed of by the Contractor. The completion date ofFebruary 16, 2024 has been established for the building demolition, removal, filling and leveling and May 31,2024 for topsoiling, fertilizing, seeding and mulching AH questions about the meaning err intent of the Bidding Documents are to be directed to ENGINEER in writing not less than 7 days prior to the date for opening of Bids.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects