Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 15, 2023

April 5, 2024

900 Park St

New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

900 Park St, Donnellson, IA

Subscribe to View Full Documents

Question Cuttoff Date & Time 8/1/2023 11:00:00 PM (ET) Construction of new 6 stall cold storage pole building at the Donnellson Maintenance Garage location, as per attached plans and project manual. Work to be done during regular working hours and days M - F 7:00 am to 3:30 pm. Pre-bid or site visit is recommended. Inspection by Iowa State Building Code Bureau. Required 1 year construction warranty and materials warranty as indicated in specs. Awarded contractor must be a licensed, bonded and insured contractor Questions: All questions related to this project are to be submitted through online on or before the cut off date and time as indicated in the solicitation. DOT Estimated Start Date: 8/31/2023 Estimated Completion date: 4/5/2024 Site visits will be scheduled in advance between July 13-26, 2023 between Monday - Thursday, the hours of 7:30 a.m. and 3:00 p.m. Fridays hours are 7:00 a.m to 10:00 a.m. Davis-Bacon wages do not apply. IADOT - 6 Stall Cold Storage Pole Building for Donnellson Maintenance Garage

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects