Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

December 18, 2023

July 12, 2025

19425 Stillmore St

Renovation

No Information to Display

$13,037,000.00

Public - County

img_map_placeholder

19425 Stillmore St, Santa Clarita, CA

Subscribe to View Full Documents

Question Deadline 08/14/2023 at 2:00 PM PT 20-133 HMC # 3439-005 100 The preparation of work under this contract covers materials that contain lead or lead based paint: including but not limited to, walls, door components, support beams, support posts, ceramic tile, structural steel, etc If upon review of the plans and/or specifications the bidder finds discrepancies in the plans and/or specifications or should he be in doubt as to the meaning or intent of any part thereof, he shall request clarification from the William S Hart Union High School District Representative. Discrepancies with regard to conflicts between the Contract Documents and applicable Federal, State or Local regulations or requirements shall be included therein. All surfaces that are only prepped and not abated during site preparation shall be primed or encapsulated using a William S Hart Union High School District approved primer or encapsulant for each type of surface or substrate that has been disturbed (wood, metal, stucco etc). All components that tested positive for the presence of lead at or above the HUD action level and any similar untested components should be considered lead-laden. Any maintenance or repair activities on these components should be performed in an abatement/containment environment as required by Cal/OSHA Construction and Safety Orders, Lead Section 1532.1. If any amount of lead is detected on a component that will be disturbed (trigger task), the contractor must perform exposure monitoring and interim protection for his workers according to Title 8 Construction and Safety Orders, to determine the workers skill and/or certification required to perform the task required for this project Lead Related Work: http://www.aaalead.com Page 4 of 17 AAA Lead Consultants and Inspections 1307 West Sixth St, #134. Corona. Ca 92882 Lead Containing Components Lead based paint and lead in ceramic tile has been identified in the following locations. Work performed on these surfaces must be performed by Department of Public Health Services Lead Certified Workers. See paragraph 4 above. Refer to site plans to determine how each component will be impacted. Exterior Multipurpose Room: Remove green and brown stucco walls as per demo plans Remove drinking fountain Walkway 2 Stabilize support beams and encapsulate Stabilize support posts and encapsulate Walkway 1 Stabilize support beams and encapsulate Stabilize support posts and encapsulate MPR/Roof 2 Remove four vent pipes Remove one vent pipe flashing Remove two drains MPR/Roof 1 Remove one vent pipe flashing Remove two drains HMC # 3439-005 100 Section Includes: Environmental controls and energy management systems, including equipment, materials, installation, start-up, testing, documentation and training according to construction documents. The project drawings establish the scope of HVAC controls work in conjunction with the scope of work indicated in Section 23 0900: HVAC Instrumentation and Controls. This Section complements the requirements of Section 23 0900, and construction drawings for controls and system communications.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.