Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 24, 2023

August 23, 2023

August 24, 2023

Nelpine Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Nelpine Rd, Preston, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The County Commissioners of Caroline County are accepting written quotes for the regrading of a County Road ditch and the construction of a culvert along Nelpine Road in the community of Jonestown in Caroline County, Maryland. The work is adjacent to the Jonestown Community Park and extends from Route 16/Harmony Road to the Jonestown Community Park parking lot entrance driveway. The parking lot driveway should not be disturbed. Work includes: Regrade the ditch to provide a consistent slope and positive drainage to the existing ditch in Harmony Road. Maximize the depth of the ditch in Nelpine Road based on the elevation of the ditch at Harmony Road Installing twenty (20) feet of 12-inch ADS culvert pipe adjacent to the pavilion. Stabilize both ends of the culvert pipe with the installation of stone. Backfill over the culvert pipe and create a level ground surface for pedestrian access to the pavilion. Seed and stabilize all disturbed areas. Assumptions: All work shall be performed in the County Road ROW and shall not disturb the SHA ROW. Do not disturb the pavement on Nelpine Road. There will be an onsite pre-construction meeting with Caroline County DPW and Planning and Codes Departments prior to commencing work. Any permits are the responsibility of the contractor. Work must be completed by August 24, 2023. Please submit any questions to Leslie Grunden, lgrunden@carolinemd.org, AND Amanda Pollack, ahp@cwp.org by noon, July 17, 2023.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.