Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

March 1, 2024

July 29, 2024

41st St

Site Work

No Information to Display

$2,989,291.00

Public - City

img_map_placeholder

41st St, Sioux City, IA

Subscribe to View Full Documents

The project is located on 41st Street and includes the extension of the sanitary sewer along 41st Street from the existing sanitary sewer west of the BNSF Railroad tracks to Highway 75 N Each bid must be made on a form furnished by the City and must be accompanied by a bid bond, a cashier's check or certified check of an Iowa bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the amount of the bid, made payable to the City Treasurer of the City of Sioux City, Iowa. The check or draft may be cashed by the City Treasurer as liquidated damages in the event the successful bidder fails to enter into a contract within the ten (10) days after notice of award and post bond satisfactory to the City ensuring the faithful fulfillment of the contract. This project has an early start date of March 1, 2024 and a late start date of April 15, 2024. All work on the overall project shall be completed within 85 working days. All work within the BNSF right of way portion of the project (above and below grade) has an early start date of March 1, 2024 and a late start date of April 15, 2024. All work on the BNSF portion of the project shall be completed within 6 working days.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.