Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2023

November 13, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

$1,819,700.00

Public - City

img_map_placeholder

To Be Determined, Salem, OR

Subscribe to View Full Documents

The Work under this contract includes relocating an existing on-site boiler, purchase and installation of a second boiler, removal of two older boilers, and necessary modifications to an existing building that will house the new boilers. Boiler work must be performed by a State Licensed Boiler Installer and all employees working for the boiler installer must also be individually certified by the State of Oregon. Willow Lake Boiler Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.