Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

December 13, 2023

Ali Ln

Site Work

No Information to Display

$444,390.00

Public - County

img_map_placeholder

Ali Ln, Auburn, CA

Subscribe to View Full Documents

Scope: The project is in Auburn, California on Ali Lane. The project is in both public utility easements (Ali Lane) and county right of way (connection on Edgewood Road). Ali Lane is a private road. The project includes 1250 LF of 8" treated water pipeline; installation of new water services; installation of new fire hydrants; trench restoration; site restoration; micro-surfacing; and all necessary appurtenances. Time for Completion, the Contractor shall complete all work and obligations under the Contract in a satisfactory manner within one hundred ten (100) consecutive calendar days The rate for these liquidated damages is hereby agreed to be $800 per day

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.