Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

October 3, 2023

May 10, 2024

W Park St

Site Work

No Information to Display

$690,000.00

Public - City

img_map_placeholder

W Park St, Elk Horn, IA

Subscribe to View Full Documents

Work on the improvement shall be commenced immediately upon approval of the contract by the Council, and be completed as stated below City of Elk Horn Pool House - Elk Horn, IA. Project number is 123.0511.09 and is located at the Elk Horn Public Pool Facility, Elk Horn City Park, east of West Park Street between Washington Street and College Street. Project consists of the construction of a 24' x 64' wood post and wood frame building with steel roof and siding panels, and all finishes necessary such as fixtures, plumbing, and electrical systems connected to the existing area utilities. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The City of Elk Horn, IA reserves the right to defer acceptance of any bid for a period of sixty (60) calendar days after receipt of bids and no bid may be withdrawn during this period. Contractor shall substantially complete the project no later than April 12, 2024 and fully complete the project no later than May 10, 2024. Should the contractor fail to complete the work in this timeframe, liquidated damages of $500.00 per calendar day will be assessed for work not completed within the designated contract term. Notice to Proceed is anticipated on September 7, 2023. The City of Elk Horn, IA does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the jurisdiction. Liquidated damages for noncompliance with said completion provisions at the rate of Five Hundred dollars ($500.00) for each calendar day

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects