Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

September 19, 2023

December 10, 2024

4251 Sunset Lake Rd

Renovation

No Information to Display

$4,500,000.00

Public - City

img_map_placeholder

4251 Sunset Lake Rd, Apex, NC

Subscribe to View Full Documents

Estimated cost is $4.0 Million - $4.5 Million A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following Demolition and abandonment of the existing Sunset Hills Lift Station Construction of a new Sunset Hills Lift Station adjacent to the existing lift station Wetwell and pump improvements Odor Control improvements Magnetic Flow Meter, and Surge Relief valve vault improvements Electrical and instrumentation improvements Temporary facilities (including bypass pumping and temporary water) as required to maintain service during construction and connection to the new facilities. General conditions including scheduling, project coordination, field work and surveying, environmental protection procedures, submittals and shop drawings, operations and maintenance data, and other requirements as specified for the coordination and execution of the Work. Grading, gravel access road, erosion control, site cleanup, and seeding. Disposal of excess and unsuitable excavation and removed excess materials. Testing of all installed sewer infrastructure. The Project consists of constructing a new 550 gpm (interim capacity) and future 1,800 gpm (buildout capacity) wastewater pump station and abandonment of an existing 500 gpm wastewater pump station. All bids must be accompanied by a 5% bid bond and shall be subject to the conditions provided in the Instructions to Bidders. Bidders shall submit with their Bids affidavits of "Good Faith Efforts" in the recruitment of Minority Businesses.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.