Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

October 2, 2023

December 27, 2023

Bear Valley Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Bear Valley Rd, Victorville, CA

Subscribe to View Full Documents

The Project includes the reconstruction of approximately two miles of Bear Valley Road, a super arterial located between US 395 and Amethyst Road in the City of Victorville. The principal scope of work will include full depth reconstruction of existing road pavement incorporating new asphalt concrete pavement, new crushed aggregate base, recycled milled asphalt base and earthwork. The work will further include placement of pavement markings, demolition and or placement of portland cement concrete curb & cutter, cross gutters & spandrels, sidewalks, drive approaches and ADA accessible curb ramps. Support Work will include temporary traffic control and storm water pollution prevention through the use of Best Management Practices and weekly inspections. Included in this bid are two small projects incorporating similar work, but further includes electrical, irrigation, landscaping and masonry wall construction. Restrictions will be in place for use of equipment and operation for work performed adjacent to or under: Kinder Morgan fuel pipelines, Southern California Edison high voltage power transmission lines and Los Angeles Department of Water and Power high voltage power transmission lines. Each Bid Proposal shall be accompanied by: (a) cash; (b) a certified or cashier's check; or (c) a bidder's bond made payable to City of Victorville in an amount equal to ten percent (10%) of the Total Base Bid as bid security. Said Bid Guaranty shall be enclosed in the same envelope as the Bid Proposal and no bid shall be considered unless such Bid Guaranty is enclosed therewith. The successful Bidder will be also required to furnish performance and payment bonds, each in an amount equal to one hundred percent (100%) of the Total Base Bid. Bidders must be licensed in accordance with the "Contractor's License Law," Chapter 9 of Division 3 of the California Business and Professions Code. At the time of submitting the bid, Bidders must possess a valid Class A California Contractor's License The Design Engineer has calculated an estimate of probable construction costs for this project. The City does not wish to publicize the engineer's estimate of the project cost since this information may tend to influence the number and nature of bids received. However, for the bidder's convenience, the City will publicize that the engineer's estimate for the base bid falls within a range of $7,750,000.00 TO $8,500,000.00 All questions, other than those asked at the pre-bid meeting and not specifically addressed within the Contract Documents, must be submitted in writing to cmcalderon@victorvilleca.gov. Questions will not be accepted after 12 p.m. on THURSDAY, July 27, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.