Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

September 1, 2023

October 10, 2024

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

To Be Determined, San Mateo, CA

Subscribe to View Full Documents

The Work generally consists of the replacement of the existing Liebert Unit Model FH267W-AA00 in the Data Center of the District Office. The new unit must have the same capacity as the current Liebert, including all associated mechanical and electrical work and integration into the facility management system (BMS). The scope includes replacing an existing CW pump on the cooling tower. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 07/25/2023 at 2:00 PM PT Bidders must direct all questions about the meaning or intent of Bidding Documents to District Representative in writing and must be submitted electronically by posting same to the Districts Online Vendor Portal

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.