Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 20, 2023

September 1, 2024

July 31, 2026

5500 Campanile Dr

New Construction, Site Work

No Information to Display

$80,000,000.00

Public - State/Provincial

img_map_placeholder

5500 Campanile Dr, San Diego, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The owner has determined a prequalified list of design build companies The previous solicitation has been included below for reference As of July 25, 2023, neither a short list nor a final selection has been determined. The Project approximately consists of: The project will construct new laboratory/lecture/research building to be named the New North Life Sciences Building located on a hillside site location on the main campus. This project will provide a 38,000 ASF/67,000 GSF STEM research and instructional facility. The project will include lower division teaching labs, upper division teaching labs interdisciplinary lecture, faculty/administrative offices, research spaces, conference rooms, mechanical, electrical and telecom support spaces. This facility will include lab spaces, core facilities with major instruments, and experimental fabrication space for collaborative work with public and private partners. This project partially replaces the existing NLS building with a new building and equivalent academic program to the new project site on campus, while mothballing a portion of the existing North Life Science facility for some future use. Last day to submit RFQ questions July 7, 2023 The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees, on behalf of San Diego State University, hereinafter called University, is requesting Statements of Qualifications (SOQ) from interested and qualified Design-Builders (Respondents) to provide design, preconstruction and design-build construction services for the project referenced above (Project). The delivery method for this Project is a modified form of the Trustees Design-Build process, called Collaborative Design-Build. This is a two-phased project delivery process: Phase 1-Design and Preconstruction Services to define the Project, hereinafter referred to as Phase 1, and Phase 2-Design-Build Construction Services to complete the design and construct the Project, hereinafter referred to as Phase 2. There will be separate agreements for each phase. This modified process selects the Design-Builder on qualifications and proposed fees (a design competition is not utilized). LIQUIDATED DAMAGES 2,500.00 LICENSE REQUIREMENTS B License

130 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.