Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

August 28, 2023

February 24, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$2,000.00

Public - City

img_map_placeholder

Multiple Locations, Sedona, AZ

Subscribe to View Full Documents

Construction of roadway improvements to the northbound lanes of State Route 89A from north of the roundabout intersection of State Route 179 to south of the intersection with Jordan Road. The Project is approximately 1,400 feet in length and includes some demolition, median modifications, new flexible pavement, concrete curbing, retaining walls, shared-use path, signage, landscaping, irrigation facilities, and drainage facilities modifications 160 calendar days after the Notice to Proceed for all work within R/W; and 180 calendar days after Notice to Proceed for Project Completion. LIQUIDATED DAMAGES: $1,000 per day beyond the calendar day Contract duration. Each bidder's proposal shall be made on forms furnished in the Contract Documents, and must be accompanied by a security consisting of a certified check, cashier's check, or bid bond in an amount of not less than ten percent (10%) of the amount of the total bid amount, and made payable to the CITY OF SEDONA, ARIZONA. In the event the successful Bidder within ten (10) calendar days after award of the Contract fails to enter into a Contract or fails to post payment and performance bonds satisfactory to the City insuring the faithful fulfillment of the Contract as required by law, the security deposit on this bid shall be forfeited to the City. The successful Bidder will be required to furnish two (2) bonds. One (1) bond, to become effective upon award of the Contract, shall be a Performance Bond substantially in the form attached, and shall be in a sum of one hundred percent (100%) of the contract price including any additions to the Contract. The Bond shall be effective throughout the construction period, including a two (2) year warranty period. The successful Bidder shall also furnish a Labor and Material Payment Bond, substantially in the form attached, to become effective upon award. Said Labor and Material Bond shall be in the amount of one hundred percent (100%) of the Contract price. The successful Bidder will be determined on the basis of the lowest responsive and responsible Proposal. The City of Sedona, Arizona reserves the right to reject any or all Proposals, to waive or not to waive any informalities, or irregularities in the Proposals received, and to accept a Proposal which in its judgment best serves the interests of the City All questions should be directed in writing to John Hall, Associate Engineer, 102 Roadrunner Drive, Sedona, Arizona 86336, or email JHall@sedonaaz.goy Contract Documents, with completed Bid Proposal, must be enclosed in a sealed envelope, addressed to :Hand Delivered and U.S. MAIL: City of Sedona, Public Works Department, 102 Roadrunner Drive, Sedona, AZ 86336 All questions should be directed in writing to John Hall, Associate Engineer, 102 Roadrunner Drive, Sedona, Arizona 86336, or email |Hsjl@sedonaaz.goy. City of Sedona Public Works Department 102 Roadrunner Drive Sedona, AZ 86336

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.