Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

August 24, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Multiple Locations, Santa Maria, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

***As of August 18, 2023. Project has been awarded to USG Water Solution but award amount is not available. the services of a qualified and experienced contractor to include our 6 reservoir tanks into a Tank Asset Management Program. In addition, all components of the tanks will be brought up to like new condition. Questions may be submitted, by written request, for an interpretation or correction thereof. Fax inquiries to: Theresa Hernandez, (805) 735-7628 or email t_hernandez@ci.lompoc.ca.us. Last day to submit questions is July 14, 2023 at 4pm. Abrasive blast clean complete interior surfaces to a SSPC-SP10 Near White finish. Remove all dust and blast products by high-pressure air, vacuum cleaning or brushing and apply the first coat of paint before any surface rust develops. Using Sherwin Williams Macropoxy 5500 LT or equivalent thinned 10%, stripe paint all welded/lap seams and pitted areas with a roller or brush. Apply one (1) full coat of Sherwin Williams Corothane I GalvaPac 1K Zinc Primer or equivalent at a DFT of 3 to 4 mils to the complete interior of the tank, riser pipe, and all other interior surfaces. Apply a second full coat of Sherwin Williams Macropoxy 5500 LT or equivalent at a DFT of 5 to 10 mils to the complete interior of the tank, riser pipe, and all other interior surfaces. Total minimum dry film thickness (DFT) for the interior two-coat system is nine (9) mils. Depending on the surface temperature, the coatings will be allowed to cure as stated on the product data sheet. Provide adequate ventilation during curing. After the coating system has adequately cured, disinfect the interior using the AWWA C-652 Method 2 Spray Method and seal for service. Plate laps or voids greater the in width shall be filled with applicable backer and Sika Flex 1A or equivalent.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects