Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 14, 2023

August 14, 2023

November 14, 2023

Multiple Locations

Site Work

No Information to Display

$70,180.00

Public - City

img_map_placeholder

Multiple Locations, Greenville, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City has established a 4% Minority Business Enterprise (MBE) and 4% Women Business Enterprise (WBE) goal for the participation of MWBE firms in supplying goods and services for the completion of this project. All firms submitting qualifications and/or proposals agree to employ "good faith efforts" towards achieving these goals and supply other information as requested in the "MWBE Professional Services Forms" included in Appendix B. Failure to complete the MWBE forms may be cause to deem the submittal nonresponsive Question Deadline 07/07/2023 at 12:00 PM ET Questions must be asked in writing via email addressed to Stacey Pigford at spigford@greenvillenc.gov All work and materials shall be in accordance with the provisions of the General Guidelines of this contract, the Project Special Provisions, the North Carolina Department of Transportation Standard Specifications for Roads and Structures, the North Carolina Department of Transportation Roadway Standards Drawings, the current edition of the Manual of Uniform Traffic Control Devices (MUTCD), and the Traffic Signal The work entails drilling, epoxy and lag bolting the speed cushions to the pavement. All of the materials required to complete the installation described above will be provided by the City, but the Contractor shall be responsible for picking up the materials at the Public Works Compound, Building E. The anticipated equipment required for the installation includes: Vehicles to transport the materials from PW to the job site; Compressed air to clean area and drill holes Portable drills (chargeable) Regular electric drills Gas powered generators to power the electric drills Drill bits (to be defined with selected Contractor) Caulking guns

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects