Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

November 13, 2023

December 9, 2024

Multiple Locations

Paving, Renovation, Site Work

No Information to Display

$3,873,952.00

Public - County

img_map_placeholder

Multiple Locations, Griffin, GA

Subscribe to View Full Documents

As of 10/23/23 project has not been awarded. The approximate extent and character of the Work is generally described as follows: The project consists of but is not limited to the Renovation of the 7,972 SQ FT. Heritage Park Gymnasium and includes selective site demolition, new utilities with connections to municipal services, new grading/drainage, new storm sewer systems, new concrete sidewalks, selective demolition of building components, new foundations, new slab on grade, new load bearing CMU/Structural Steel/Cold Formed Steel Roof Framing, new metal framed stairs, pointing/repair/painting of existing masonry veneers, new exterior window/door systems, new roof/fascia/eave systems, new building insulation, new interior CMU walls, new interior floor/base/wall/ceiling finishes, new, new interior architectural millwork, new interior doors, new interior accessories/equipment, new plumbing fixture/piping systems, new HVAC/ductwork systems, new primary/secondary/general electrical distribution systems, new lighting systems and fire alarm devices/systems. The time allowed for Substantial Completion is 360 days, and the time allowed for completion and readiness for final payment is 390 days from the date of commencement. Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond Form with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five (5%) of the total amount payable by the terms of the contract, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required. A Certification of Insurance will be required from the low bidder prior to award of the Contract. All Bids will remain subject to acceptance for ninety days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. *Plans and specifications are for viewing purposes only. All contractors must contact Paragon Consulting Group to purchase an official set.*

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.