Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2023

September 20, 2023

December 6, 2023

71 W Van Buren St

Renovation

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

71 W Van Buren St, Chicago, IL

Subscribe to View Full Documents

The Federal Bureau of Prisons (FBOP) anticipates issuance of solicitation 15B40123B00000002 for the award of a firm-fixed-price construction contract for a project entitled Unit 19 Lower Shower Renovation at the Metropolitan Correctional Center (MCC Chicago), located in Chicago, Illinois. MCC Chicago is a federal correctional facility located at 71 W. Van Buren Chicago Illinois 60605. The project consists of furnishing all equipment, materials and labor for the complete construction of the work. The purpose of the project is to provide all necessary labor, equipment and materials and related services to include trowel able epoxy, cmu block work. See the Statement of Work/Specifications attachment included with the solicitation posting (to be issued at a later date as described herein) for the complete requirements of the work. The performance period for the project will be 77 Calendar Days from issuance of the notice to proceed. The NAICS code for this requirement is 238990 with a corresponding small business size standard of $16.5 million. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude of the project lies between $25,000 $100,000. (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.