Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

October 2, 2023

January 10, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Felton, CA

Subscribe to View Full Documents

Bids will be received for a single prime contractor to repair a segment of the pipeline along that runs through the Felton Diversion. Procore Construction Software will be used for purposes of managing communication, submittals, testing results, and other documents throughout the construction contract. The contractor's document controller, cost and staff engineers are required to attend training from the construction management team for a minimum of three (3) days during mobilization. The software will be managed by the CM with access provided to the Contractor. The Contractor must be familiar with Procore Construction Software. The Project includes repair of an existing pipeline and bank stabilization at the south bank of Zayante Creek. The existing pipeline, 24-inch barwrapped concrete cylinder pipe (CCP), includes joint repairs and realignment for two 40-foot pipe sections. Bank stabilization includes rebuilding of the eroded creek bank and installation of rock slope protection. Additionally, work includes flow diversion, tree and debris removal, and all other work for the successful repair and realignment of the pipeline and creek protection against future erosion. Questions to be directed to Lewis Kay. All questions must be in writing and received a minimum of 5 business days prior to the opening date *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions and requests for information related to this Invitation for Bids should be directed to Lewis Kay (lkay@santacruzca.gov). All questions shall be in writing and received a minimum of 5 business days prior to the bid opening date.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.