Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

October 16, 2023

September 30, 2024

Multiple Locations

Site Work

No Information to Display

$2,342,000.00

Public - County

img_map_placeholder

Multiple Locations, Martinez, CA

Subscribe to View Full Documents

The work generally consists of the replacement of approximately 1,400 linear feet (LF) of 20-inch sewage force mains, including aerial crossings and connections to existing structures in Martinez, CA. The force mains are within District easements on Union Pacific Railroad's Right of Way, Waterfront Park (City of Martinez), and Martinez Refining Company's (PBF Energy) property. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Inquiries regarding further information about the Project may be directed to Keith Gellerman at (925) 229-7268 or kgellerman@centralsan.org. The Contractor shall comply with all the terms, conditions and requirements attached to all permits, bonds and licenses required by any local, state, or federal agencies to perform work, construct, erect, test and start-up of any equipment or facility for this Contract. The Contractor shall give all notices necessary and incidental to the due and lawful prosecution of the Work The District reserves the right to disapprove scheduler when submitted by Contractor if not qualified. Rejection of Warranties: The District reserves the right to reject warranties and to limit selections to products with warranties not in conflict with requirements of the contract Documents. The District reserves the right to refuse to accept work for the project where a special warranty, certification, or similar commitment is required on such work or part of the work, until evidence is presented that entities required to countersign such commitments are willing to do so.

38 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.